Road Tunnel Works, Kent

We were asked to supply, install and test a new emergency speaker system for an operational road tunnel. This project required the works to be conducted when the tunnel was closed overnight and to operate within tight time restrictions. The new speaker system required the provision of new containment and cabling, bespoke stainless steel brackets for the speakers alongside new panels. The system was successfully tested and witnessed to the Client before being made operational.